I am the agent for the Camas River's Edge
Homeowner's Association (HOA).
The HOA recently got permits in place to drive piling for a
community dock on the Columbia River.
One of the conditions is to have three Stellar Sea Lion Observers
during pile driving.
The project must happen before Feb 15th 2011, so I need a quick
response if possible.
Minimum qualifications are:
Attachment A. Minimum Qualifications for Marine Mammal Observers
1. Visual acuity in both eyes (correction is permissible)
sufficient for discernment of moving
targets at the water's surface with ability to estimate target
size and distance. Use of binoculars may be
necessary to correctly identify the target.
2. Advanced education in biological science, wildlife management,
mammalogy or related fields
(Bachelor's degree or higher is preferred).
3. Experience and ability to conduct field observations and
collect data according to assigned
protocols (this may include academic experience).
4. Experience or training in the field identification of marine
mammals (cetaceans and pinnipeds).
5. Sufficient training, orientation or experience with vessel
operation and pile driving operations to
provide for personal safety during observations. All vessel
operators will possess, on their person, a WA
boater education card.
6. Writing skills sufficient to prepare a report of observations
that would include such information
as the number, type, and location of marine mammals observed; the
behavior of marine mammals in the
project area during construction, dates and times when
observations and in-water construction activities
were conducted; dates and times when in-water construction
activities were suspended to avoid incidental
harassment by disturbance from construction noise; etc.
7. Ability to communicate orally, by radio or in person, with
project personnel to provide real time
information on marine mammals observed in the area, as necessary.
Anyone qualified and interested can contact me for the 3 page
document that needs to be followed.
A proposal from a team of three would be preferred, individual
responses gladly accepted.
Thanks for allowing my posting.
Jack Loranger, Shoreline Permit Procurement, loranger@saw.net